Areas of activity

Harbour construction

Insenerehituse AS can build and renovate harbour facilities of any design or draught. The company has procured pole-ramming equipment of different capacities and Viiking floating crane with a lifting capacity of 100 tonnes to support its business. We mainly undertake general contracting, but can also serve as a subcontractor in major hydraulic engineering projects or act as consultants during the planning stage.

Our past projects

Environmental construction

We have completed a number of projects on rivers to improve migration and spawning conditions for fish. The works have included demolition of old damming structures, construction of new fish passes and spawning areas, as well as installation of Estonia’s first electronic fish counter on Loobu river.

Our past projects

Elimination of residual pollution

We have performed several operations to eliminate residual pollution on former military and industrial areas. We have also applied biological soil treatment without soil extraction.


Our past projects

Available special equipment

  • Viiking floating crane – lifting capacity 100T
  • Bottom-opening 400m3 soil transportation barge
  • Crane-operated high frequency vibratory pile-driver
  • Excavator-operated high frequency vibratory pile-driver Movax SPH-75
  • Impact pile-driver
  • Kobelco long boom excavator – 36T, boom range 17m
  • Bed leveller for construction of underwater gravel bed

More information