Construction and design of Muuga container terminal

Period: 12.2011 – 9.2012
Customer: Rail Garant Estonia OÜ
Description of work: Design of a new container terminal on the territory of Muuga Harbour of AS Tallinna Sadam, foundation and pole work for the reinforced concrete crane track beam and track installation. In consortium with Lemminkäinen Eesti AS