Design and construction for emergency repair of Quays 9a/10a in Muuga Harbour

Period: 4.2012 – 9.2012
Customer: AS Tallinna Sadam
Description of work: Repair of the main pile superstructure and 14 pole connecting nodes, repair and restoration of load-bearing capacity of the service bridge and the structural connecting nodes of the superstructure of the main and intermediate piles. Delivery and installation of new fenders. Injection repair of concrete cracks.