Reconstruction of bank reinforcement of Quay 1 in the Old City Harbour of AS Tallinna Sadam

Period: 5.2013 – 8.2013
Customer: AS Tallinna Sadam
Description of work: Designing the slope under the bank reinforcement, manufacture and installation of 360 tetrapods, installation of a storm water discharge and a sampling well.