Reconstruction of Quay 1 in Virtsu Harbour

Period: 10.2009 – 6.2010
Customer: AS Kuressaare Ehitus
Description of work: Demolition of edge beam and old ramp, sinking sheeting and tube poles for a new ramp, concrete pouring for installation of ramp fenders and bollards, installation of new fenders and bollards, construction and assembly of metal parts of the ramp, waste water collection and pumping equipment, construction of pressured waste water pipes, electrical installation, pouring 2,000m3 of concrete for erosion protection, lined with 1,350m3 of granite stones, dredging, driveways, and yards, incl. 3,800m2 of asphalt pavement.