Repair and reinforcement of connecting nodes with raft foundation of poles no. 2 and 3 of Quay 1/2 in Muuga Harbour

Period: 5.2013 – 9.2013
Customer: Tallinna Sadam AS
Description of work: Opening of connecting nodes, removal of damaged concrete and concrete pouring at waterline.

IMGP0468